| undated | i14-factsheet.pdf One-page overview of the I-14 Central Texas Corridor Study. | I-14 | 0.9 MB |
| undated | sh-30-alternative-a-roundabout.pdf | SH 30 | 2.3 MB |
| undated | sh-30-alternative-b-twltl.pdf | SH 30 | 2.3 MB |
| undated | sh-30-alternative-c-hooded-left.pdf | SH 30 | 2.3 MB |
| undated | sh-30-fact-sheet.pdf Fact sheet for the separate SH 30 at the Navasota River project. | SH 30 | 1.1 MB |
| 2026-08-11 | 081126-FAQs.pdf TxDOT's own answers on why the bands are drawn a mile wide, how routes narrow over time, and what happens to property inside a study corridor. | I-14 | 0.2 MB |
| 2026-08-11 | 081126-I-14 Central Sub Area Comment Card 20260807.pdf | I-14 | 0.4 MB |
| 2026-08-11 | 081126-I-14 East Sub Area Comment Card 20260807.pdf | I-14 | 0.4 MB |
| 2026-08-11 | 081126-I-14 West Sub Area Comment Card 20260807.pdf | I-14 | 0.4 MB |
| 2026-08-11 | 081126-Process Board.pdf Where Round 3 sits in the study timeline and what the remaining steps are. | I-14 | 0.7 MB |
| 2026-08-11 | 081126-Round 3 Open House Public Meetings Boards_20260810.pdf The full Round 3 exhibit board set, 11 MB. This is the material that hung on the walls at the August 2026 open houses, including the conceptual route bands this viewer maps. | I-14 | 10.9 MB |
| 2026-08-11 | 081126- SH 6 Board-rev.pdf | I-14 | 0.9 MB |
| 2026-08-11 | 081126- SH 6 Board-rev2.pdf | I-14 | 0.9 MB |
| 2026-08-11 | 081126- SH 6 Board.pdf The SH 6 Alignment Study board — a separate ongoing study whose area overlaps the corridor work. | I-14 | 0.9 MB |
| 2026-08-11 | 081126-central-comment-card.pdf The Central sub-area comment card, covering the Loop I-214 routes around Bryan and College Station. | I-14 | 0.3 MB |
| 2026-08-11 | 081126-east-comment-card.pdf The East sub-area comment card, covering the approach from Huntsville. | I-14 | 0.3 MB |
| 2026-08-11 | 081126-notice.pdf Formal public notice of the Round 3 open houses: dates, venues and how to comment. | I-14 | 0.1 MB |
| 2026-08-11 | 081126-west-comment-card.pdf The West sub-area comment card, covering the approach from Temple and Rogers. | I-14 | 0.3 MB |
| 2025-12-15 | 121525-sh-30-alternative-a-roundabout.pdf | SH 30 | 2.4 MB |
| 2025-12-15 | 121525-sh-30-alternative-b-twltl.pdf | SH 30 | 2.4 MB |
| 2025-12-15 | 121525-sh-30-alternative-c-hooded-left.pdf | SH 30 | 2.4 MB |
| 2025-12-09 | 120925-SH 30_exhibit Boards.pdf | SH 30 | 9.5 MB |
| 2025-12-09 | 120925-notice.pdf | SH 30 | 0.2 MB |
| 2025-12-09 | 120925-sh-30-comment-form.pdf | SH 30 | 1.0 MB |
| 2025-01-07 | 010725-schematic.pdf SH 30 schematic, January 2025 — the funded causeway replacement that overlaps several conceptual corridors. | SH 30 | 6.8 MB |
| 2024-08-21 | 082124-comment-card.pdf | I-14 | 0.1 MB |
| 2024-08-21 | 082124-exhibits.pdf Round 2 exhibit boards from August 2024, 114 MB. Useful for seeing how the study area narrowed between rounds. | I-14 | 114.4 MB |
| 2024-08-21 | 082124-notice.pdf | I-14 | 0.1 MB |
| 2024-08-06 | 080624-exhibit-boards.pdf | I-14 | 114.4 MB |
| 2024-07-09 | 070924-press-release-meetings-postponed.pdf Press release postponing the July 2024 meetings. | I-14 | 0.1 MB |
| 2024-07-08 | 070824-exhibit-boards.pdf | I-14 | 7.5 MB |
| 2024-06-26 | 062624-notice.pdf | I-14 | 0.1 MB |
| 2024-06-24 | 062424-comment-card.pdf | I-14 | 0.1 MB |
| 2024-06-24 | 062424-exhibit-boards.pdf Round 2 exhibit boards as first published in June 2024, 123 MB. | I-14 | 123.3 MB |
| 2023-10-18 | 101823-boards.pdf Round 1 exhibit boards, October 2023 — existing conditions, before any route concepts existed. | I-14 | 18.4 MB |
| 2023-10-18 | 101823-comment-card.pdf | I-14 | 0.1 MB |
| 2023-10-18 | 101823-comment.pdf | I-14 | 0.1 MB |
| 2023-10-18 | 101823-fact-sheet.pdf | I-14 | 1.1 MB |
| 2023-10-18 | 101823-faq-rev.pdf The revised FAQ from the first round of open houses in October 2023. | I-14 | 0.1 MB |
| 2023-10-18 | 101823-faq.pdf | I-14 | 0.1 MB |
| 2023-10-18 | 101823-notice.pdf | I-14 | 0.1 MB |
| 2023-10-18 | 101823-survey.pdf | I-14 | 0.1 MB |
| 2023-03-27 | 032723-i-14-fact-sheet.pdf Earlier fact sheet from March 2023, at the outset of the study. | I-14 | 1.2 MB |
| 2022-02-01 | 020122-schematic.pdf | SH 30 | 5.4 MB |